JLS Brick & Block JLS Brick & BlockLancaster, PA · Est. 1986
Mid-Atlantic Commercial Masonry Subcontractor

Engineered masonry. Built to outlast the building.

The Mid-Atlantic’s specialty masonry subcontractor for commercial, institutional, and high-end residential builds. Bonded, BIM-coordinated, and scaled for GC bid lists — from 30 masons to 220 inside 72 hours.

  • $45MSingle-project bond
  • 96%On-time delivery
  • 0.42OSHA TRIR
  • 220+W-2 masons on payroll
Differentiators · Verified

Why GCs put JLS on the bid list.

Six procurement-grade numbers that move a bid from the back of the stack to the shortlist. No marketing spin — field-logged, bond-verified.

  • 01 1,140+ Commercial masonry projects completed since 1986 Repeat-client work with High, Wohlsen & Warfel on 18+ builds
  • 02 96% On-time delivery across the last decade of field work Average punch-list close-out under 4 business days
  • 03 $45M Single-project bond capacity · $180M aggregate Verified across PA, NJ, DE, MD, NY, VA, WV
  • 04 220+ W-2 field masons on direct payroll — zero day-labor Scalable to 220 inside a 72-hour mobilization window
  • 05 $8.2M Owned scaffold & mast-climber fleet, in-house No rental mark-up passed to your trade budget
  • 06 4 days Average punch-list close-out vs. industry’s 21-day standard Awarded 2023 ABC Keystone Subcontractor of the Year

Headquartered at 1140 Enterprise Way, Lancaster, PA · Licensed & bonded in PA, NJ, DE, MD, NY, VA, WV · ABC Keystone Chapter member since 1991.

Capabilities · Self-Performed

Scope we self-perform, in-house, with our own W-2 crew.

Every scope below is delivered by JLS-employed masons and engineers — no subcontracted layers, no trade pass-through. Pre-construction BIM coordination runs before a single brick is laid.

A load-bearing CMU block wall rising on a commercial job site, with vertical reinforcement bars at each cell.
Featured scope

Load-Bearing CMU & Structural Masonry Systems

Reinforced concrete masonry unit shells engineered to carry roof, deck, and lateral loads on warehouses, schools, and mid-rise commercial builds. Our largest single project — a 1.4 million-block warehouse shell for Liberty Logistics, completed 2022 — was built on this scope with zero bond claims.

  • Single-source scope: layout, supply, set, grout, clean
  • Clash detection run in Revit before mobilization
  • Wind & seismic reinforcement per project specs
See full CMU spec →
02

Brick Veneer & Cavity Wall Assemblies

Architectural brick veneer on steel and CMU backup, including through-wall flashing, weeps, and air-barrier integration for retail centers, hospitals, and multi-family facades.

Read assembly details →
03

Structural Brick & Architectural Load-Bearing

Solid brick load-bearing walls for institutional and high-end residential work, with on-site mortar color matching and project-specific brick blending from certified suppliers.

Read structural brick scope →
04

Stone, Restoration & Pre-Construction BIM

Cut stone and cast-stone assemblies, masonry restoration on occupied campuses, and our in-house BIM/Revit masonry modeling team that runs clash detection before mobilization.

Read stone & BIM scope →
Field telemetry · 1986–2024

38 years on the trowel. Measured in numbers, not slogans.

Bond capacity, man-hours, OSHA rates, and repeat GC relationships — the data a procurement team pulls before the bid invite goes out.

  1. 287 W-2 employees on payroll 220+ field masons · 14 project engineers · in-house BIM/Revit modeling team
  2. 2.1M Man-hours logged on commercial job sites in the past decade Lancaster, PA HQ · licensed & bonded across PA, NJ, DE, MD, NY, VA, WV
  3. 0.42 OSHA Total Recordable Incident Rate (TRIR) Roughly one-sixth the masonry industry average of 2.6
  4. 18+ Repeat projects with named GC clients High Construction · Wohlsen Construction · Warfel Construction
Largest single project 1.4M-block warehouse shell · Liberty Logistics · 2022
Bond capacity $45M single project · $180M aggregate · zero claims lost
Industry recognition Masonry Magazine Top 50 · 2019–2024 · ABC Keystone Sub of the Year 2023
Project ledger · contracted work

Selected work, 2019–2024.

Named projects with executed contracts or active bid relationships. Scope, square footage, and block counts are pulled from the as-built estimate packages — not marketing copy.

  • Concrete masonry unit warehouse shell mid-construction with perimeter scaffolding
    Distribution · 2022

    Liberty Logistics — Warehouse Shell

    Bird-in-Hand, PA · 1,140,000 CMU · 412,000 SF · tilt-in precast + masonry

    Our largest single project to date. 1.4 million block laid over 14 months with a peak crew of 186 W-2 masons mobilized inside 72 hours of the GC's notice to proceed.

  • Red brick K-12 school exterior with limestone accent bands
    Institutional · K-12

    Conestoga Valley School District — Middle School Addition

    Lancaster, PA · 184,000 face brick · 62,400 SF · occupied-campus phasing

    Phased delivery across an in-session campus. BIM-level layout accuracy let us hold a 4 mm tolerance against the existing 1998 brick veneer on three sides of the addition.

  • Hospital addition with brick veneer and precast trim
    Healthcare · 2023

    Penn State Health — Surgical Pavilion Addition

    Hershey, PA · 96,000 brick · 41,800 SF · infection-control work windows

    Masonry scope tied to an active surgical wing. Negative-pressure containment, daily clean-out, and a 4-business-day punch-list close-out on every phase release.

  • Restored historic brick facade with replacement brick and stone sills
    Historic restoration

    Lancaster Central Market — West Wing Restoration

    Lancaster, PA · 38,000 hand-laid brick · 14,200 SF · 1889 facade rebuild

    Hand-mixed lime mortar to match the original 1889 specification, every replacement brick cut on-site from a single salvage batch sourced before demolition. Reviewed and signed off by the PA Historical & Museum Commission.

Pre-bid Q&A · for GC PMs & developer estimators

What procurement teams ask before sending the ITB.

Six questions, answered up-front. If your ITB asks something we haven't covered here, the estimating desk picks up — +1 (717) 555-0186 or [email protected].

What is your service area and license footprint?

JLS is a Mid-Atlantic commercial masonry subcontractor headquartered in Lancaster, PA. We hold active contractor licenses and bond status in seven states: Pennsylvania, New Jersey, Delaware, Maryland, New York, Virginia, and West Virginia. We do not chase nationwide work — our crews, scaffold yards, and supplier pricing are all concentrated inside this footprint for predictable mobilization.

What is your single-project and aggregate bond capacity?

$45 million single project / $180 million aggregate, underwritten by our surety on a continuous bond form. We have never lost a bond claim in 38 years of operation. Bond letter, W-9, and most recent audited financials are released under NDA on request from the GC's prequalification desk.

How does the in-house BIM/Revit masonry model and clash detection actually run?

Our 14-project-engineer team models every awarded scope in Revit at LOD 350 before mobilization — sleeves, embeds, shelf angles, relief joints, ties, and all adjacent structural and MEP penetrations. The clash report is shared with the GC's VDC lead within ten business days of contract and re-run at every model revision. No brick is laid off a layout that hasn't been modeled.

How fast can you scale crew, and is the labor self-performed?

From a baseline of 30 W-2 masons we scale to 220 inside 72 hours of an executed change order or NTP — every one of them on our direct payroll, no day-labor, no sub-tiered layers. The scaffold and mast-climber fleet is company-owned ($8.2M in equipment), so there are no rental mark-ups or third-party delivery windows on the critical path.

What is your safety record on commercial job sites?

Our OSHA Total Recordable Incident Rate sits at 0.42 across the past three reporting years — roughly one-sixth the masonry industry average of 2.6. We submit project-specific safety plans, daily JHAs, and a full EMR packet with every bid. Superintendent-to-crew ratio stays at or below 1:18 on every commercial scope.

What does close-out look like — punch list, warranties, turnover?

Average punch-list close-out under 4 business days from the GC's first walk — versus the industry 21-day standard. We bundle the as-built model, brick lot tracking, mortar mix records, cleaning & sealing warranties, and our two-year workmanship warranty into a single turnover package delivered to the GC's project engineer.

Request a Project Bid Bid requests receive a written scope confirmation within one business day.